Features

Features, Whitepapers

Common Data Environments in Practice

Closing the gap between ISO 19650 compliance and real information control on Australian projects Executive SummaryCommon Data Environments (CDEs) have moved from a niche BIM concept to a standard clause in Australian government contracts. Under ISO 19650, a CDE is not a piece of software — it is a governed process for creating, checking, approving and sharing project information, built around four defined states: Work in Progress, Shared, Published and Archived. Most Australian firms, however, still describe “the CDE” as if naming a shared drive or a construction cloud platform makes it one. This matters more than it used to. Infrastructure Australia has recommended digital engineering become mandatory for federally funded infrastructure. Transport for NSW and Victoria’s Health Building Authority now write specific digital engineering requirements — including mandated data standards — into tender conditions. Deloitte and Autodesk’s 2026 State of Digital Adoption research shows Australian construction firms are buying more technology than ever (an average of 7.6 platforms per firm, up from 6.9) while workforce skills remain “the weakest area” of digital capability and fewer than half of on site teams have real time access to project data. Globally, Autodesk and FMI Consulting estimate poor quality construction data cost the industry US$1.8 trillion in 2020 alone. For the government, defence, health and education projects there is a further layer most CDE guidance skips entirely: security. ISO 19650-5 sets out a “security-minded approach” for exactly this situation — projects where information about an asset could be misused to cause harm — and it has direct implications for how a CDE should classify and restrict information, not just store it. This paper sets out what a CDE is actually meant to do, the recurring ways implementations fail on real Australian projects, what the emerging state and federal digital engineering frameworks now expect and a practical framework for building a CDE that still works — and still hands over a usable dataset — at practical completion. 1. The Promise and the RealityEvery construction technology vendor sells the same story: one platform, one source of truth, every discipline working from the same current information, no more emailed PDFs with three people’s markups layered on top of each other. It’s a compelling pitch and it is broadly true of what a well run Common Data Environment can deliver. The trouble starts with what “well run” requires. ISO 19650 — the international standard for managing information over the whole life cycle of a built asset using building information modelling — defines a CDE precisely: an agreed source of information for any given project or asset, for collecting, managing and disseminating each information container through a managed process. The definition is about the process, not the product. A CDE is something a project does, not something a project buys. In practice, on a great many Australian projects, “the CDE” is used as a synonym for whichever platform was procured — Aconex, Autodesk Construction Cloud, Asite, BIM 360, Trimble Connect, or a bespoke SharePoint site — with little of the underlying governance actually running inside it. The 2026 State of Digital Adoption in the Construction Industry report, produced by Deloitte Access Economics and Autodesk across 954 Asia-Pacific businesses (287 of them Australian), found the median number of separate systems in use at a construction firm fell from eleven to six over the past survey cycle. That looks like consolidation. Read against the same report’s finding that fewer than half of on site teams have access to real time project data and that a quarter of firms still rely mainly on paper based systems, it reads instead as an industry buying fewer, bigger platforms without yet resolving how information actually moves between the people who need it. This paper is about that gap — between owning a CDE platform and running a CDE process — and about what closing it actually requires, particularly for the security sensitive government, defence, health and education projects where the cost of getting it wrong is measured in more than rework. 2. What a CDE Actually Is Under ISO 19650Stripped of vendor branding, ISO 19650 describes a CDE as a managed workflow with four states that every information container — a drawing, a model, a schedule, a specification — passes through. Moving a container between WIP and Shared is meant to happen through a defined Check, Review, Approve (CRA) process, not by dragging a file into a different folder. Suitability codes and revision codes travel with each container to signal what it’s fit for (a coordination draft, a for construction issue, an as-built record) independently of which state it’s currently in. And the framework assigns clear roles — an Appointing Party (the client), one or more Lead Appointed Parties (head contractors or consultants), Task Team Managers and an Information Manager function responsible for the CDE’s governance across the whole project. None of this is exotic. It’s closer to the version control discipline borrowed from software engineering than to anything unique to construction. What makes it hard in practice is that a construction project isn’t one team with one set of habits — it’s dozens of firms, each with their own internal IT conventions, folder structures and naming preferences, expected to converge on a single shared discipline for the life of the project. The platform can enforce permissions. It cannot, on its own, enforce the discipline. 3. Where CDEs Break Down in PracticeWorking across defence, government, health and commercial construction projects, the same handful of failure patterns recur, almost regardless of which platform sits underneath. No one owns the Information Management functionISO 19650 assumes a named Information Manager role, responsible for the CDE’s naming conventions, folder taxonomy and CRA workflow and for auditing whether people are actually following it. On many projects this role exists on paper — usually assigned to whoever wrote the BIM Execution Plan — and then goes unfunded and unstaffed for the life of the project. Without someone actively policing it, every subcontractor reverts to their own naming and

Features, Whitepapers

Why Construction Keeps Losing the Productivity Argument

1. Executive SummaryAustralia’s construction sector is in a productivity crisis and the numbers are damning. Labour productivity in construction has declined by 12 per cent since 1994 even after adjusting for improvements in building size and quality. Over the same period, the rest of the Australian economy lifted productivity by 49 per cent. Physical dwelling productivity — the number of homes completed per hour worked — has plummeted by more than 50 per cent over three decades. The standard explanations for this decline point to labour shortages, small firm fragmentation, regulatory burden and rising material costs. These factors are real. But they mask a more fundamental problem: construction continues to operate on a model of information management that would be unrecognisable and unacceptable in any other industry of comparable scale. This whitepaper examines the productivity argument through an information lens. It draws on Australian government data, independent research and Productivity Commission findings to argue that until the industry treats information as a managed asset and not an after thought, the productivity gap will persist regardless of what else changes. -12% Labour productivity in construction since 1994 (PC, 2025) +49% Labour productivity in construction since 1994 (PC, 2025) $47B Labour productivity in construction since 1994 (PC, 2025) 2. The Scale of the ProblemThe Productivity Commission’s February 2025 report “Housing construction productivity: Can we fix it?” provides the most comprehensive recent analysis of Australia’s construction productivity crisis. Its findings are stark and they extend well beyond the residential sector. 2.1 Three decades of going backwardsPhysical dwelling productivity — the number of homes completed per construction worker hour — has fallen by more than 50 per cent since 1994/95. Put simply, it now takes twice the labour input to build what we built thirty years ago. Labour productivity, which adjusts for quality improvements and the increasing size of new homes, has still declined by 12 per cent since 1994. By comparison manufacturing productivity grew by 23 per cent and the broader market economy by 49 per cent across the same period. “Dwelling construction productivity has slumped over the last decade — down by 14% in the value of houses built and 33% in the number of houses built, over the last two decades.” — Ai Group Research & Economics, 2025 The Queensland Productivity Commission’s October 2025 inquiry reached similar conclusions at the state level: Queensland’s construction labour productivity is only 5 per cent higher than it was in 1994/95, while the broader Queensland market economy grew by 65% over the same period. Since 2018 construction productivity in Queensland has actually declined by a further 9 per cent. National housing targets are now a visible casualty. Australia committed under the National Housing Accord to build 1.2 million new homes over five years from July 2024 which is 240,000 per year. In 2023/24, approximately 176,000 dwellings were completed. The National Housing Supply and Affordability Council projects that the five year target will be missed by around 257,000 homes. 2.2 The cost of this gapAcademic research published in 2025 estimates a $47 billion annual productivity gap in Australian construction. This figure represents the additional output the sector would generate if it matched productivity benchmarks achievable with current technology and processes. Beyond aggregate output, the cost manifests in three specific ways: 3. The Standard Arguments — and Their LimitsThe productivity debate in Australian construction is well worn. The same explanations recur in every government inquiry and industry report. Each contains truth. Each is also incomplete. “It’s a labour problem”Labour shortages are real and significant. Jobs and Skills Australia found that every occupation within the construction trades was in national shortage in 2023 making construction the most labour shortage affected industry in Australia. In the first quarter of 2024, there were 27,500 vacant construction positions, representing 2.2% of all industry jobs which is nearly double the typical vacancy rate. Current forecasts suggest a shortfall of 300,000 workers by mid 2027. But labour scarcity explains a constraint on volume not a decline in output per hour worked. If the sector is producing less per worker hour now than it did in the 1990s when labour was more readily available, labour supply alone is not the root cause. “It’s a firm size problem”The CEDA 2025 report “Size Matters: Why Construction Productivity Is So Weak” makes a compelling case that fragmentation drives the productivity gap. It found that 98.5% of Australian construction firms have fewer than 20 employees and that large firms (200+ employees) generate 86% more revenue per worker than small firms. If Australian construction matched the size distribution of manufacturing, it would produce an estimated $54 billion more per year without additional labour. Scale matters. But consolidation does not automatically solve productivity, it creates the conditions for it. Large firms that remain information poor simply fail at scale. “It’s a regulatory problem”Planning approvals, building codes and procurement rules all impose real friction. Both the Productivity Commission and Queensland Productivity Commission identify regulatory burden as a significant contributor to productivity drag. Reforms are underway across multiple jurisdictions. But regulation is an external constraint, not an internal capability gap. Firms that build strong information management practices benefit from those practices regardless of the regulatory environment. Regulatory reform lifts the ceiling; better information management raises the floor. “It’s a technology adoption problem”Australia’s construction sector has accelerated its technology adoption in recent years. The Deloitte “State of Digital Adoption in the Construction Industry 2026” survey found that Australian businesses now use an average of 7.6 technologies — up from 6.9 in 2025 — and that 48% of construction sector employees use sector specific technology weekly which is the second highest rate in the Asia-Pacific region. Yet technology adoption without information discipline produces a different problem: fragmented data spread across multiple disconnected systems, none of which speaks to the others. Tools without governance create noise. The industry has a technology adoption story it can tell. What it cannot yet tell is an information management story. 4. The Information Problem Nobody NamesConstruction produces extraordinary

Features, Projects

The Markets Apartments

The Markets Apartment Development is a Design & Construct project in collaboration with ICON Construction and ICON Mechanical, aimed at delivering residential units that meet contemporary living standards. 3DS Group provided comprehensive modeling services to ensure seamless integration of mechanical systems within the building design.

Features, Insight

Initial Thoughts on ISO/DIS 19650-1 Updates (from an Information Management lens) 

I’ve been looking through the proposed updates to ISO/DIS 19650-1, and there’s a lot to be positive about.  Bringing delivery and operations closer together is a big step forward. From an information management perspective, it better reflects the reality we’re all working toward — treating information as something that supports the full asset lifecycle, not just individual phases.  It’s also a good prompt for us as an industry to think more holistically about how we structure and manage information from day one.  That said, it does highlight where we still have work to do.  Take naming as a simple example. The principles are solid — clear, structured, consistent information. But implementing that in tools like Revit can still be challenging:  It’s not always seamless. But in a way, that’s where the opportunity is.  These updates don’t just raise the bar for standards — they give information managers a stronger platform to push for better alignment between process, standards, and tools. Whether that’srefining workflows, improving templates, or influencing how tools are configured and used.  The direction feels right. Now it’s about making it work in practice.  Keen to hear how others in information management are approaching this — especially around naming and making information usable across the lifecycle. 

Features, Insight

Standards vs Tools — who’s really responsible? 

Something WE’ve been thinking about more lately from an information management perspective…  We put a lot of effort into defining standards — clear workflows, structured data, consistent naming, better outcomes. And rightly so.  But in practice, how much of that is actually shaped (or limited) by the tools we use?  The reality is, the workflows we can implement and the way we manage information are often constrained by the platforms we’re working in — and even more so by the ecosystem we’re locked into. What looks good in a standard doesn’t always translate cleanly into day-to-day delivery.  So it raises an interesting question:  Is it the responsibility of standards to adapt to the tools? Or should tools be evolving to properly support the intent of the standards?  From where we  sit, it’s probably somewhere in the middle.  Standards need to be practical and implementable. But at the same time, they should be setting the direction — pushing for better, more connected ways of working, even if the tools aren’t quite there yet.  Maybe the real opportunity sits with information managers acting as the bridge — translating intent into reality, working within constraints, and gradually influencing both standards and tool use along the way.  Curious how others see it — are your workflows driven more by standards, or by the tools you have available? 

Features, Whitepapers

The Hidden Cost of Poor Engineering Information and How to Fix It

1. Executive SummaryPoor engineering information is one of the most persistent and costly challenges facing Defence, Government, and construction projects. Inaccurate models, inconsistent documentation and uncontrolled information flows create delays, rework and risk — often without organisations fully realising the financial and operational impact. is whitepaper examines the true cost of poor engineering information and why it continues to undermine major projects and what organisations can do to fix it. It provides a practical, actionable framework for improving accuracy, governance and coordination across the entire engineering information lifecycle. 2. Introduction: Why Engineering Information Quality Matters More Than EverEngineering information is the foundation of every project decision — from design and procurement to construction, commissioning and operations. When that information is incomplete, inconsistent or unreliable, the consequences ripple across teams, disciplines and project phases. In an era of increasing complexity, multi‑disciplinary delivery and heightened security expectations, organisations can no longer afford to treat engineering information as an afterthought. High‑quality, secure and well‑governed information is now a strategic asset. 3. The Hidden Cost of Poor Engineering InformationPoor engineering information rarely appears as a single catastrophic failure. Instead, it shows up as hundreds of small inefficiencies, errors and delays that accumulate into major cost and schedule impacts. 3.1 Rework and Redesign 3.2 Slow Decision‑Making 3.3 Coordination Breakdowns 3.4 Procurement and Supply Chain Impacts 3.5 Safety and Compliance Risks 3.6 Long‑Term Asset Management Issues 4. Why Poor Engineering Information Happens Despite advances in digital engineering, the root causes remain surprisingly consistent: 4.1 Fragmented Workflows Teams use different tools, standards and processes — creating inconsistency. 4.2 Lack of Governance Without clear ownership, assurance and version control, information quality degrades quickly. 4.3 Inconsistent BIM Maturity Contractors and consultants vary widely in capability leading to uneven outputs. 4.4 Manual, Document‑Centric Processes Reliance on PDFs, spreadsheets and email increases the risk of error. 4.5 Limited Security Controls Uncontrolled file sharing and mixed‑clearance teams create both quality and security risks. 4.6 Time and Cost Pressures Teams often prioritise speed over accuracy — only to pay for it later through rework. 5. The Financial Impact: What Poor Information Really Costs While the symptoms are familiar the true cost is often underestimated. For Defence and Government, the stakes are even higher: national‑security risk, operational disruption and reputational damage. 6. How to Fix It: A Practical Framework for High‑Quality Engineering Information3DS Group recommends a structured, scalable approach built around four pillars. 6.1 People: Capability, Roles, and Accountability 6.2 Process: Standardised, Secure, and Repeatable Workflows 6.3 Technology: Tools That Enable Accuracy and Control 6.4 Governance: Assurance, Compliance, and Continuous Improvement 7. What Organisations Should Do NowTo reduce risk and improve outcomes, organisations should: 8. ConclusionPoor engineering information is not just a technical issue — it is a strategic risk. It slows delivery, increases cost, undermines confidence and exposes organisations to compliance and security vulnerabilities. The good news is that it is fixable. With the right people, processes, technology and governance, organisations can dramatically improve information quality, reduce rework and deliver projects with greater certainty and security. 9. About 3DS Group3DS Group is a leading Australian provider of digital engineering, BIM management and secure engineering information services for Defence, Government into the construction sector. The company delivers end to end capability across modelling and drafting, BIM consulting and project delivery and high security information management for projects with multi level classified data requirements. With deep expertise in complex precincts, federated model management, CDE governance and secure unique workflows for levels of classified engineering data, 3DS Group enables asset owners, contractors and suppliers to meet stringent technical and security requirements. Their multidisciplinary team brings proven experience, rigorous quality standards and a strong track record supporting major national programs.

Features, Whitepapers

The Future of Secure Digital Engineering in Defence, Government and Critical Infrastructure

1. Executive SummarySecure digital engineering is rapidly becoming a national priority as Defence and Government agencies shift toward model centric delivery and increasingly complex project environments. Engineering information which was once considered operationally benign, is now recognised as a high value asset requiring the same level of protection as traditional classified material. This whitepaper explores the emerging standards, technologies and governance models shaping the future of secure digital engineering in Australia and outlines the steps organisations must take to uplift capability, reduce risk and prepare for the next generation of Defence and Government programs. 2. Introduction: Why Security and Digital Engineering Are ConvergingAustralia’s Defence and Government sectors are undergoing a fundamental transformation. Traditional document based engineering workflows are being replaced by data rich models, digital twins and integrated information environments. As this shift accelerates, the security implications become impossible to ignore. This direction is strongly reinforced at the highest levels of Defence leadership. As Deputy Secretary Chris Deeble noted: “By working more closely with industry in this space, existing partners and small to medium enterprises will have the opportunity to contribute to the design of shared collaborative platforms, delivering speed and capability in a secure and streamlined digital environment. The Defence Digital Engineering Strategy is about leveraging technologies to enhance efficiency, accessibility and innovation. This strategy marks an important milestone in Defence’s digital transformation journey in line with the National Defence Strategy and further opens the door for industry wide digital engineering consultation and collaboration.” — DepSec Chris Deeble His comments highlight a clear mandate: Defence expects industry to help shape secure, collaborative and future ready digital engineering ecosystems. This convergence of digital engineering and security is not optional — it is now a strategic requirement for all organisations operating in Defence and Government environments. 3. The Current State of Digital Engineering in Australia’s Secure SectorsDigital engineering maturity across Defence, Government and critical infrastructure remains uneven. While some agencies and prime contractors have adopted advanced BIM and model based workflows, many projects still rely on fragmented models, inconsistent standards and manual coordination.These gaps create vulnerabilities: duplicated data, uncontrolled file sharing, unclear ownership and limited traceability. In environments where teams operate at mixed security clearance levels, the risk compounds. Poor information security doesn’t just slow delivery — it increases exposure, drives rework, and undermines trust in the engineering information itself. 4. The Security Imperative: Why Engineering Information Is Now a TargetEngineering information has become a strategic asset. Models and drawings reveal structural layouts, system connections, access points and operational dependencies — making them attractive targets for cyber actors, insider threats and supply chain compromise. Recent global incidents have shown how engineering data can be exploited to disrupt operations, compromise assets or gain intelligence advantage. As Australia strengthens its Defence posture and invests in sovereign capability, protecting engineering information is no longer optional — it is essential. 5. Regulatory Landscape and Compliance Expectations Agencies and contractors must now navigate a growing ecosystem of standards and frameworks, including DISP, PSPF, ISM, ISO 19650‑5 and asset owner specific requirements.These frameworks increasingly emphasise: 6. The Future: Key Trends Shaping Secure Digital Engineering 6.1 Secure by Design BIM and Model WorkflowsSecurity controls will be embedded directly into modelling processes, ensuring that information is protected from creation through to handover. 6.2 Multi Level Classified Environments and Segmented WorkflowsProjects will increasingly operate across mixed clearance teams, requiring sophisticated segmentation, access control and workflow design. 6.3 Digital Twins and the Security ChallengeDigital twins introduce real time data flows and operational insights — increasing both opportunity and exposure. Protecting these environments will require new governance models. 6.4 Automation, AI and Model‑Driven Decision MakingAutomation will improve accuracy and speed but also introduce new risks around data integrity, model provenance and algorithmic trust. 6.5 Federated Model Governance at ScaleLarge precincts and multi disciplinary programs will rely on robust governance frameworks to ensure consistency, traceability and secure information exchange. 7. A Practical Framework for Secure Digital Engineering3DS Group proposes a practical, scalable framework built around four pillars: People Process Technology Governance This framework ensures that security is embedded, not bolted on. 8. What Organisations Should Do NowTo prepare for the future, organisations should: 9. ConclusionSecure digital engineering is no longer a niche requirement — it is the foundation of modern Defence and Government project delivery. As models become richer and more interconnected, the need for robust governance, secure workflows and disciplined information management will only intensify.Organisations that embrace this shift will deliver with greater confidence, reduce risk, and contribute to Australia’s national‑security resilience. 10. About 3DS Group3DS Group is Australia’s trusted partner for secure digital engineering, BIM management and engineering information governance. We operate across multi level classified environments and support some of the nation’s most complex Defence, Government and critical infrastructure programs.Our integrated capability — from modelling to secure information governance — ensures accuracy, security and confidence at every stage of the project lifecycle.