Common Data Environments in Practice

Closing the gap between ISO 19650 compliance and real information control on Australian projects Executive SummaryCommon Data Environments (CDEs) have moved from a niche BIM concept to a standard clause in Australian government contracts. Under ISO 19650, a CDE is not a piece of software — it is a governed process for creating, checking, approving and sharing project information, built around four defined states: Work in Progress, Shared, Published and Archived. Most Australian firms, however, still describe “the CDE” as if naming a shared drive or a construction cloud platform makes it one. This matters more than it used to. Infrastructure Australia has recommended digital engineering become mandatory for federally funded infrastructure. Transport for NSW and Victoria’s Health Building Authority now write specific digital engineering requirements — including mandated data standards — into tender conditions. Deloitte and Autodesk’s 2026 State of Digital Adoption research shows Australian construction firms are buying more technology than ever (an average of 7.6 platforms per firm, up from 6.9) while workforce skills remain “the weakest area” of digital capability and fewer than half of on site teams have real time access to project data. Globally, Autodesk and FMI Consulting estimate poor quality construction data cost the industry US$1.8 trillion in 2020 alone. For the government, defence, health and education projects there is a further layer most CDE guidance skips entirely: security. ISO 19650-5 sets out a “security-minded approach” for exactly this situation — projects where information about an asset could be misused to cause harm — and it has direct implications for how a CDE should classify and restrict information, not just store it. This paper sets out what a CDE is actually meant to do, the recurring ways implementations fail on real Australian projects, what the emerging state and federal digital engineering frameworks now expect and a practical framework for building a CDE that still works — and still hands over a usable dataset — at practical completion. 1. The Promise and the RealityEvery construction technology vendor sells the same story: one platform, one source of truth, every discipline working from the same current information, no more emailed PDFs with three people’s markups layered on top of each other. It’s a compelling pitch and it is broadly true of what a well run Common Data Environment can deliver. The trouble starts with what “well run” requires. ISO 19650 — the international standard for managing information over the whole life cycle of a built asset using building information modelling — defines a CDE precisely: an agreed source of information for any given project or asset, for collecting, managing and disseminating each information container through a managed process. The definition is about the process, not the product. A CDE is something a project does, not something a project buys. In practice, on a great many Australian projects, “the CDE” is used as a synonym for whichever platform was procured — Aconex, Autodesk Construction Cloud, Asite, BIM 360, Trimble Connect, or a bespoke SharePoint site — with little of the underlying governance actually running inside it. The 2026 State of Digital Adoption in the Construction Industry report, produced by Deloitte Access Economics and Autodesk across 954 Asia-Pacific businesses (287 of them Australian), found the median number of separate systems in use at a construction firm fell from eleven to six over the past survey cycle. That looks like consolidation. Read against the same report’s finding that fewer than half of on site teams have access to real time project data and that a quarter of firms still rely mainly on paper based systems, it reads instead as an industry buying fewer, bigger platforms without yet resolving how information actually moves between the people who need it. This paper is about that gap — between owning a CDE platform and running a CDE process — and about what closing it actually requires, particularly for the security sensitive government, defence, health and education projects where the cost of getting it wrong is measured in more than rework. 2. What a CDE Actually Is Under ISO 19650Stripped of vendor branding, ISO 19650 describes a CDE as a managed workflow with four states that every information container — a drawing, a model, a schedule, a specification — passes through. Moving a container between WIP and Shared is meant to happen through a defined Check, Review, Approve (CRA) process, not by dragging a file into a different folder. Suitability codes and revision codes travel with each container to signal what it’s fit for (a coordination draft, a for construction issue, an as-built record) independently of which state it’s currently in. And the framework assigns clear roles — an Appointing Party (the client), one or more Lead Appointed Parties (head contractors or consultants), Task Team Managers and an Information Manager function responsible for the CDE’s governance across the whole project. None of this is exotic. It’s closer to the version control discipline borrowed from software engineering than to anything unique to construction. What makes it hard in practice is that a construction project isn’t one team with one set of habits — it’s dozens of firms, each with their own internal IT conventions, folder structures and naming preferences, expected to converge on a single shared discipline for the life of the project. The platform can enforce permissions. It cannot, on its own, enforce the discipline. 3. Where CDEs Break Down in PracticeWorking across defence, government, health and commercial construction projects, the same handful of failure patterns recur, almost regardless of which platform sits underneath. No one owns the Information Management functionISO 19650 assumes a named Information Manager role, responsible for the CDE’s naming conventions, folder taxonomy and CRA workflow and for auditing whether people are actually following it. On many projects this role exists on paper — usually assigned to whoever wrote the BIM Execution Plan — and then goes unfunded and unstaffed for the life of the project. Without someone actively policing it, every subcontractor reverts to their own naming and

Features, Whitepapers

Why Construction Keeps Losing the Productivity Argument

1. Executive SummaryAustralia’s construction sector is in a productivity crisis and the numbers are damning. Labour productivity in construction has declined by 12 per cent since 1994 even after adjusting for improvements in building size and quality. Over the same period, the rest of the Australian economy lifted productivity by 49 per cent. Physical dwelling productivity — the number of homes completed per hour worked — has plummeted by more than 50 per cent over three decades. The standard explanations for this decline point to labour shortages, small firm fragmentation, regulatory burden and rising material costs. These factors are real. But they mask a more fundamental problem: construction continues to operate on a model of information management that would be unrecognisable and unacceptable in any other industry of comparable scale. This whitepaper examines the productivity argument through an information lens. It draws on Australian government data, independent research and Productivity Commission findings to argue that until the industry treats information as a managed asset and not an after thought, the productivity gap will persist regardless of what else changes. -12% Labour productivity in construction since 1994 (PC, 2025) +49% Labour productivity in construction since 1994 (PC, 2025) $47B Labour productivity in construction since 1994 (PC, 2025) 2. The Scale of the ProblemThe Productivity Commission’s February 2025 report “Housing construction productivity: Can we fix it?” provides the most comprehensive recent analysis of Australia’s construction productivity crisis. Its findings are stark and they extend well beyond the residential sector. 2.1 Three decades of going backwardsPhysical dwelling productivity — the number of homes completed per construction worker hour — has fallen by more than 50 per cent since 1994/95. Put simply, it now takes twice the labour input to build what we built thirty years ago. Labour productivity, which adjusts for quality improvements and the increasing size of new homes, has still declined by 12 per cent since 1994. By comparison manufacturing productivity grew by 23 per cent and the broader market economy by 49 per cent across the same period. “Dwelling construction productivity has slumped over the last decade — down by 14% in the value of houses built and 33% in the number of houses built, over the last two decades.” — Ai Group Research & Economics, 2025 The Queensland Productivity Commission’s October 2025 inquiry reached similar conclusions at the state level: Queensland’s construction labour productivity is only 5 per cent higher than it was in 1994/95, while the broader Queensland market economy grew by 65% over the same period. Since 2018 construction productivity in Queensland has actually declined by a further 9 per cent. National housing targets are now a visible casualty. Australia committed under the National Housing Accord to build 1.2 million new homes over five years from July 2024 which is 240,000 per year. In 2023/24, approximately 176,000 dwellings were completed. The National Housing Supply and Affordability Council projects that the five year target will be missed by around 257,000 homes. 2.2 The cost of this gapAcademic research published in 2025 estimates a $47 billion annual productivity gap in Australian construction. This figure represents the additional output the sector would generate if it matched productivity benchmarks achievable with current technology and processes. Beyond aggregate output, the cost manifests in three specific ways: 3. The Standard Arguments — and Their LimitsThe productivity debate in Australian construction is well worn. The same explanations recur in every government inquiry and industry report. Each contains truth. Each is also incomplete. “It’s a labour problem”Labour shortages are real and significant. Jobs and Skills Australia found that every occupation within the construction trades was in national shortage in 2023 making construction the most labour shortage affected industry in Australia. In the first quarter of 2024, there were 27,500 vacant construction positions, representing 2.2% of all industry jobs which is nearly double the typical vacancy rate. Current forecasts suggest a shortfall of 300,000 workers by mid 2027. But labour scarcity explains a constraint on volume not a decline in output per hour worked. If the sector is producing less per worker hour now than it did in the 1990s when labour was more readily available, labour supply alone is not the root cause. “It’s a firm size problem”The CEDA 2025 report “Size Matters: Why Construction Productivity Is So Weak” makes a compelling case that fragmentation drives the productivity gap. It found that 98.5% of Australian construction firms have fewer than 20 employees and that large firms (200+ employees) generate 86% more revenue per worker than small firms. If Australian construction matched the size distribution of manufacturing, it would produce an estimated $54 billion more per year without additional labour. Scale matters. But consolidation does not automatically solve productivity, it creates the conditions for it. Large firms that remain information poor simply fail at scale. “It’s a regulatory problem”Planning approvals, building codes and procurement rules all impose real friction. Both the Productivity Commission and Queensland Productivity Commission identify regulatory burden as a significant contributor to productivity drag. Reforms are underway across multiple jurisdictions. But regulation is an external constraint, not an internal capability gap. Firms that build strong information management practices benefit from those practices regardless of the regulatory environment. Regulatory reform lifts the ceiling; better information management raises the floor. “It’s a technology adoption problem”Australia’s construction sector has accelerated its technology adoption in recent years. The Deloitte “State of Digital Adoption in the Construction Industry 2026” survey found that Australian businesses now use an average of 7.6 technologies — up from 6.9 in 2025 — and that 48% of construction sector employees use sector specific technology weekly which is the second highest rate in the Asia-Pacific region. Yet technology adoption without information discipline produces a different problem: fragmented data spread across multiple disconnected systems, none of which speaks to the others. Tools without governance create noise. The industry has a technology adoption story it can tell. What it cannot yet tell is an information management story. 4. The Information Problem Nobody NamesConstruction produces extraordinary

Projects

CIT Woden Campus

The Canberra Institute of Technology (CIT) Woden Campus is a modern educational facility designed to support up to 6,500 students annually. The campus offers courses in IT, cybersecurity, business, and hospitality, equipped with smart classrooms, simulated learning environments, and commercial kitchens. 3DS Group handled Digital Delivery, BIM Management, Mechanical Modeling, AV Modeling, and ICT Modeling, partnering with Lendlease.

Projects

Australian War Memorial

The Australian War Memorial Development Project is a $550 million initiative to modernise and expand the Memorial’s exhibition and building spaces. The project includes constructing new galleries, refurbishing existing facilities, and enhancing public areas to better honor Australian service personnel. 3DS Group provided Digital Delivery, BIM Management, Mechanical Modeling, Electrical Modeling, and ICT Modeling services, partnering with Lendlease, Kane Constructions, Martin Donnelly, and Benmax Mechanical.

Features, Projects

The Markets Apartments

The Markets Apartment Development is a Design & Construct project in collaboration with ICON Construction and ICON Mechanical, aimed at delivering residential units that meet contemporary living standards. 3DS Group provided comprehensive modeling services to ensure seamless integration of mechanical systems within the building design.

Projects

Garema Place Hotel

The Garema Place Hotel is a luxury hotel development in Canberra’s city center, designed to boost the local tourism and hospitality industry. The project includes 238 rooms and is set to open in 2027. 3DS Group contributed Digital Delivery, BIM Management, Mechanical Modeling, and Electrical Modeling, collaborating with TP Dynamics.

Projects

Civic Pub

The Civic Pub project, in partnership with Complete HVAC and Construction Control, focused on the design and construction of renovated and upgraded facilities to enhance customer experience. 3DS Group delivered mechanical modeling and BIM management to support successful project completion.

BIM Maturity Guides

Beating BIM Bureaucracy

BIM was meant to simplify the construction industry. Better collaboration. Better information. Better decisions. Yet somewhere along the way, we’ve wrapped it in layers of documentation, standards, templates and processes that can make even simple tasks feel unnecessarily complicated. Even the term BIM has become confusing. Depending on who you ask, it stands for Building Information Modelling, Building Information Management or Better Information Management. We spend so much time debating terminology that we sometimes forget the objective: managing information so projects are delivered more effectively. Don’t get me wrong, governance is important. Large projects need structure, consistency and accountability. But there’s a fine line between providing guidance and creating bureaucracy. More documents doesn’t mean better delivery. Walk onto most projects today and you’ll find BIM Execution Plans, Digital Engineering Management Plans, Information Requirements, naming conventions, classification standards, workflows, registers and countless checklists. Most of these documents exist for a reason. The problem is when maintaining the documentation becomes the work, rather than enabling the work. I’ve seen teams spend weeks refining management plans while practical coordination issues remained unresolved. At that point we’ve lost sight of why the documents existed in the first place. Everyone Has Their Own Version One organisation has a BIM Execution Plan. Another has a Digital Engineering Management Plan. A third calls it an Information Management Plan. The names change, the templates change and the terminology changes, but often they’re trying to achieve the same outcome. Instead of creating consistency across the industry, we’re constantly translating between different versions of the same process. Standards Should Help, Not Hinder Standards such as ISO 19650 are valuable because they provide a framework for managing information. The danger is when compliance becomes more important than outcomes. Rather than asking, “How can this improve the way we manage information?”, we ask, “What extra document do we need to satisfy this requirement?” The standard hasn’t created the bureaucracy – we have. How Do We Beat BIM Bureaucracy? The answer isn’t fewer standards or less governance. It’s being intentional about what we create. Before introducing another document, template or workflow, ask yourself: Every new process introduces overhead. Every additional document requires someone to maintain it. Simplicity isn’t about removing governance, it’s about ensuring every process earns its place. Keep the Goal in Sight At its heart, BIM isn’t about producing documents. It isn’t about creating the perfect naming convention or the most comprehensive management plan. It’s about helping the right people access the right information at the right time so they can make better decisions. If we focus on that outcome first, the paperwork becomes a tool instead of a burden. And perhaps that’s how we beat BIM bureaucracy, not by throwing away standards but by remembering that they’re supposed to support delivery, not become the delivery itself. The best BIM managers aren’t the ones who write the longest BIM Execution Plans. They’re the ones whose teams barely notice the process because it simply works.

Insight

The Productivity Paradox: Why More Technology Doesn’t Always Mean More Productivity

Over the last decade the construction industry has invested heavily in BIM, Common Data Environments (CDEs), digital engineering teams, automations and more recently, AI. The promise has always been the same: improved productivity. By giving teams better access to information and reducing manual effort, technology was expected to help projects deliver more with less. So why do many teams still feel overwhelmed? Despite having access to more tools than ever before, many professionals find themselves navigating an increasingly complex digital landscape. Information is spread across multiple systems, dashboards generate endless reports and new technologies are often introduced before existing ones have been fully adopted. This is often referred to as the Productivity Paradox: the observation that significant investments in technology do not always result in proportional improvements in productivity. One reason is that technology often accelerates existing processes rather than improving them. A poorly designed process does not become efficient simply because it has been digitised. Many of us have seen this first hand. An organisation invests in a CDE for data management only to utilise the same folder structures and naming conventions they always used, leading to a CDE just as broken as their previous system. The technology has changed but the issue remains. The industry has also become exceptionally good at collecting data. Project teams can track model health, field observations, RFIs, quality records and countless other metrics in real time. However, more information does not necessarily lead to better decisions. The challenge is no longer obtaining data. The challenge is identifying what information actually matters and ensuring it reaches the right people at the right time. Artificial intelligence presents another opportunity to improve productivity but it also raises an important question. If AI is simply layered onto already complex processes, are we reducing effort or just generating more information to manage? The greatest benefits are likely to come from organisations that use technology to simplify workflows rather than add further complexity. This is where digital transformation often succeeds or fails. The question is not always which tool to implement but what problem is actually being solved. At 3DS Group, we work with organisations to maximise the value of their digital investments by focusing on people, processes and information as much as technology. In many cases, the solution is not another platform or dashboard but a clearer understanding of workflows, data requirements and business objectives. Technology remains a powerful enabler but productivity is not created by software alone. It is created when people, processes and technology work together effectively. As the industry continues to embrace new digital capabilities, the challenge may not be finding the next tool. It may be having the discipline to simplify what already exists.

Features, Insight

Initial Thoughts on ISO/DIS 19650-1 Updates (from an Information Management lens) 

I’ve been looking through the proposed updates to ISO/DIS 19650-1, and there’s a lot to be positive about.  Bringing delivery and operations closer together is a big step forward. From an information management perspective, it better reflects the reality we’re all working toward — treating information as something that supports the full asset lifecycle, not just individual phases.  It’s also a good prompt for us as an industry to think more holistically about how we structure and manage information from day one.  That said, it does highlight where we still have work to do.  Take naming as a simple example. The principles are solid — clear, structured, consistent information. But implementing that in tools like Revit can still be challenging:  It’s not always seamless. But in a way, that’s where the opportunity is.  These updates don’t just raise the bar for standards — they give information managers a stronger platform to push for better alignment between process, standards, and tools. Whether that’srefining workflows, improving templates, or influencing how tools are configured and used.  The direction feels right. Now it’s about making it work in practice.  Keen to hear how others in information management are approaching this — especially around naming and making information usable across the lifecycle.